PROJECT DESCRIPTION
This 51,000 square foot project in the Stadium Innovation Center SODO addressed the office and manufacturing space requirements for Oculus VR. The unique dual temperature chilled water system is designed around a single air-cooled Multistack Turbocor compressor chiller serving both chilled water loads as well as a decoupled elevated temperature loop for the chilled beams on the project. Due to the compact construction schedule requested by the owner, CMS also provided a Canariis factory pre-piped/tested outdoor pumping skid complete with chilled water pumps, chilled beam pumps, and DDC controls.
INDUSTRY
Industrial/Technology
LOCATION
Seattle, WA